|
|
|
The District is stocking for resale, the materials that are needed to secure tree revetments: duckbills, cable, clamps and drive bar.
|
|
6 " Duckbill (each)
|
$8.54
|
|
6" Duckbill with cable loop attached (each)
|
|
$12.15
|
|
1/4" cable/foot
|
$0.36
|
|
1/4" clamp (each)
|
$0.28
|
|
Steel Drive Bar
|
$40.17
|
|
District will loan out a wire cutter for a deposit of $75.00, refundable upon the tool's return, in good condition, within one week of the completion of the revetment.
|
|
Items are picked up at the ONRCD office. Please call in advance to arrange a time. Total payment due when order is picked up. Checks should be made payable to "ONRCD".
|
|
To order use Tree Revetment Supplies Order Form (requires Acrobat Reader), or email or call.
|
|
|